JavaScript is off. The calculator is unavailable, but the worked example and calculation below are still readable.
Nothing you enter is saved or sent. Change a value and the previous result clears.
No values entered yet.
Important: Nominal air movement based on stated free-air flow. Real mixing, ducting, resistance, obstructions, leakage and placement can change the result. This is not a drying-time estimate or Part F compliance result.
Job or reference: ____________________ Printed: not generated
Calculation: volume = length × width × height; nominal ACH = stated airflow ÷ volume; minutes = 60 ÷ nominal ACH
How it’s worked out
volume = length × width × height; nominal ACH = stated airflow ÷ volume; minutes = 60 ÷ nominal ACH
Worked example
5 m × 4 m × 2.4 m gives 48.0 m³. At 240 m³/h, nominal ACH is 5.0 and one nominal change is 12.0 minutes.
Keep a copy
Print this page to keep the values, result, calculation and date together.